Loading

Planned project on Estrada do Campo still requires construction permit

Land and Urban Construction Bureau
2016-03-04 18:51
The Youtube video is unavailable

A planned private residential project on Estrada do Campo in Coloane does not currently have a construction permit, says the Land, Public Works and Transport Bureau.

The Government has yet to issue such a permit, as the project’s developer has not so far submitted a final construction plan.

Starting construction on any project without a building permit is against the law, stressed the Bureau.

As the developer has yet to submit finalised building plans and technical drawings, the criteria for applying for a construction permit have not at present been met.

The Bureau emphasised that a building permit would be issued for a project only after such building plans and technical drawings were approved. The Bureau would also solicit opinions from the relevant authorities when considering such an approval process.

The standard consideration for approval would be given by the Bureau to the project in the event that a finalised building plan is submitted.


To get the latest official news, please subscribe the Government Information Bureau’s Telegram News Channel at https://t.me/macaogcsEN.
Subscription
MSAR GCS Facebook
MSAR GCS Facebook
MSAR GCS Wechat Channel
MSAR GCS Wechat Channel
Wechat page (traditional Chinese): gcsmacau 澳門政府資訊
Wechat page (simplified Chinese): macaoinfo 澳門特區發佈
MSAR GCS Government News Channel
MSAR GCS Government News Channel
Link is copied.
Jump to page top