Loading

Officials of the Public Works Bureau open documents for the pre-qualification in the second phase of a limited tendering for the design and construction of the Taipa Grande Tunnel and its linkage – tunnel and southern link.

Government Information Bureau
2025-01-07 17:40
  • Officials of the Public Works Bureau open documents for the pre-qualification in the second phase of a limited tendering for the design and construction of the Taipa Grande Tunnel and its linkage – tunnel and southern link.

The Youtube video is unavailable

To get the latest official news, please subscribe the Government Information Bureau’s Telegram News Channel at https://t.me/macaogcsEN.
Subscription
MSAR GCS Facebook
MSAR GCS Facebook
MSAR GCS Wechat Channel
MSAR GCS Wechat Channel
Wechat page (traditional Chinese): gcsmacau 澳門政府資訊
Wechat page (simplified Chinese): macaoinfo 澳門特區發佈
MSAR GCS Government News Channel
MSAR GCS Government News Channel
Link is copied.
Jump to page top